top of page

🌞

In 2024, we installed two advanced solar systems to enhance our sustainability and energy efficiency. The larger system, with a 30 kWh capacity and 57 solar panels, is located on our office building, while the smaller 13 kWh system, featuring 24 panels, is installed on the shop building.
CCS office is equipped with battery backup to ensure reliable power during outages. Together, these systems provide approximately 90% of our annual electricity needs, demonstrating our commitment to reducing our environmental impact and increasing energy independence.

bottom of page